Link System Project-en

Project: LINK SYSTEM
Location: Ancash
Client: ANTAMINA

Project Description:

  • Design, Manufacturing and Transport of 01 Square Section Metal Barge 8000 x 6500 x 1900 mm approx. Profiles in A-36, designed to support 03 vertical turbine pumps of 40 HP, with approximate weight per pump of 1500 kg.
  • Includes Monorail structure and Hoist lifting system with load capacity of 2 TM, (02) Sump Pumps, Electric Starters, Crouse Hinds Luminaires, Anchors (“dead”) and Winches for Anchors.

Monorail Support Structure (2TM) (h=5.5 m) with Columns, Rail Beam, Secondary Beams and Braces in A-36 Profiles.

  • Monorail Beam for 2 Tons of Lifting with Overhangs at the Ends.
  • Supports Bolted to the Platform Base Structure.
  • Metal Structures Finish: 9 mills Epoxy

Work Platform 3.00m x 0.80m with A-36 profiles, located at a height of 3.20 from the Barge Platform.

  • Floor with 42 kg/m2 standard grating in A-36 material.
  • Railings in Ø1 ¼” STD pipe in A-53.
  • Light Cat Ladder with A-36 Profiles.
  • 12” SCH 40 Discharge Manifold

Assembly of the fabrications on site, with Cranes provided by Antamina and launching of the barges in the lagoon.