Project: QUEBRADA BLANCA, PHASE 2
Location: Antofagasta
Country: Chile
Client: Bechtel Chile
Project Description:
- Largest and most equipped floating pumping system in the region, consisting of the following systems:
- 07 barges to keep 07 1500hp vertical turbine pumps afloat and in operation.
- Maintenance barge with 10 TN JIB CRANE that allows removal and transfer of equipment such as Pump and Motor (1500HP), and includes outboard motors for navigation.
- 10 anchor pontoons.
- Electronic protection system, optical fiber, ballast and venting system.
- Special lighting according to Chilean standards.
- Lightning rod protection system.
- 1400m of 6m long floating walks.
- 1400 floats for 7km of discharge pipes.