Cerro Verde Mine Project-en

Project: CERRO VERDE MINE
Location: Uchumayo – Arequipa
Client: FLUOR

Project Description:

  • 02 Barge systems with rectangular section floats of 16.5 x 7.2 x 2.5 m., each to support 04 vertical turbine pumps with 1500 hp motors. Includes access walks and anchoring pontoons.
  • Motor Control Center with automatic barge stabilization system that includes 06 submersible pumps for ballast, electronic valve control panel, LTU sensors, lighting system and electric winches.
  • 16” diameter discharge hoses with #300 flanges and support floats with 24” HDPE pipes.
  • Electrical components RTD panel with NEMA 4X enclosure, medium voltage cable and control and automation system. Galvanized trays and ladders located on 3 levels for cable routing.
  • General lighting system for barges for night work. Safety system with Tetrapuntal lightning rods against electrical storms for the protection of people, machines and equipment on the barge platform with general grounding.