Fruta del Norte Project-en

Project: FRUTA DEL NORTE
Location: Zamora-Chinchipe
Country: Ecuador
Client: LUNDIN GOLD

 

Project Description:

  • Design and manufacture of a multiple metal barge system, designed to support and maintain 03 GOULDS brand 125hp VTP pumps in operation.
  • Rectangular section metal floats completely ballasted for system stability. Finished with organic zinc and 12 millimeter interior and exterior epoxy.
  • Includes discharge manifold and “S” curve to reach the water level and connect with the 12” diameter discharge pipe.
  • Lifting system with three monorails in A-36 profiles (one per pump) for maintenance work and motor-pump removal. Each monorail with its own 2TM hoist.
  • 200 m of floating walk in 6 meter sections, with all safety requirements for personnel mobilization.