Quebrada Blanca Project Phase 2-en

Project: QUEBRADA BLANCA, PHASE 2
Location: Antofagasta
Country: Chile
Client: Bechtel Chile

 

Project Description:

  • Largest and most equipped floating pumping system in the region, consisting of the following systems:
  • 07 barges to keep 07 1500hp vertical turbine pumps afloat and in operation.
  • Maintenance barge with 10 TN JIB CRANE that allows removal and transfer of equipment such as Pump and Motor (1500HP), and includes outboard motors for navigation.
  • 10 anchor pontoons.
  • Electronic protection system, optical fiber, ballast and venting system.
  • Special lighting according to Chilean standards.
  • Lightning rod protection system.
  • 1400m of 6m long floating walks.
  • 1400 floats for 7km of discharge pipes.